Milk Carton Double Corrugated Cardboard Production Line
Delivery term:The date of payment from buyers deliver within days-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2017-10-30 01:24
-
Browse the number:
60
+
Tianjin Whelk Trading Co. Ltd
- Contactaixin:
Contactaixin:
whelk(Ms.)
- telephone:
-
Area:
Beijing
Address:The Orchard Road No. 3 01, Orchard Village Street,Beichen Dis., Tianjin, Tianjin, China (300000)
- Website:
+
Model Number: whelk-410
Brand Name: whelk
Key Specifications/Special Features:
Product descriptionDistributors wanted high speed 5 layer corrugated cardboard production line/corrugated carton making machineType: WJ100-2000-I type 5 layer corrugated paperboard production line:The maximum production width of the corrugated cardboard: 2000mmDesign speed: 100m/minEconomic speed: 60-80m/minNote: Production line speed test paper should meet the following requirements: (the surface temperature of the equipment is not less than 172℃)Paper rating of not less than B grade Paper moisture content of about: 11%±2%Top paper: 100—250g/m2core paper: 100--250g/m2
Corrugated paper: 100—200g/m2
Flute-type combination: A,C,B,E(as customers’requirement)
Steam the necessary requirements:
Amount of steam 2500—3000Kg/Hr the highest pressure: 1.2Mpa
Common pressure: 0.8-1.1Mpa
Power supply: 380V 50Hz Three-phase four-wire system
Equipment installed total power: about120KW
The actual power consumption: about 60KW(full speed)
Equipment covers: about46m×10m×5m(Specific length of foundation Figure prevail)
Equipment out of paper orientation: According to the user to determine the transmission plant set left or right position
Equipment applicability, available in A, B, C class domestic or imported paper
Corrugated paper: 100—200g/m2
Flute-type combination: A,C,B,E(as customers’requirement)
Steam the necessary requirements:
Amount of steam 2500—3000Kg/Hr the highest pressure: 1.2Mpa
Common pressure: 0.8-1.1Mpa
Power supply: 380V 50Hz Three-phase four-wire system
Equipment installed total power: about120KW
The actual power consumption: about 60KW(full speed)
Equipment covers: about46m×10m×5m(Specific length of foundation Figure prevail)
Equipment out of paper orientation: According to the user to determine the transmission plant set left or right position
Equipment applicability, available in A, B, C class domestic or imported paper
Shipping Information:
- FOB Port: Tianjin
- Lead Time: 20 - 90 days
Main Export Markets:
- Asia
- Australasia
- Central/South America
- Mid East/Africa
- North America
- Western Europe